94
W9215-8135-1
06/2021
Operation
Operating the boom U10-5
To raise the boom, pull the right control lever back (figure/ ).
To lower the boom, push the right control lever forward
(figure/ ).
The boom moves as shown in the figure.
Watch the boom during lowering, so that the boom or
the bucket teeth do not hit the dozer.
1
Summary of Contents for K008-5
Page 1: ...GB COMPACT EXCAVATOR MODELS K008 5 U10 5 OPERATING INSTRUCTIONS W9215 8135 1 Original 06 2021...
Page 14: ...12 W9215 8135 1 06 2021 General information...
Page 36: ...34 W9215 8135 1 06 2021 Safety rules...
Page 50: ...48 W9215 8135 1 06 2021 Description of the excavator...
Page 127: ...Maintenance W9215 8135 1 125 06 2021...
Page 152: ...150 W9215 8135 1 06 2021 Maintenance...
Page 154: ...152 W9215 8135 1 06 2021 Safety inspection...
Page 162: ...160 W9215 8135 1 06 2021 Lifting capacity of the excavator...
Page 167: ...Accessories W9215 8135 1 165 06 2021...
Page 168: ......