7
ASSEMBLY INSTRUCTIONS
2. Attach the side frame to the boom.
A
Do not tighten the nuts too firmly. Keep 2 to 3 threads
between the boss and the nuts.
A
When the boom cylinder fulcrum has been
repositioned, make sure that the left and right fulcrum
positions (A and B) are the same. Then proceed to the
job.
C
Stand
1. Raise the boom until the stands can be rotated.
2. Remove the spring pins holding the stands to the
boom.
3. Rotate the stands until the pin on the stand and hole in
the boom are aligned.
Then slide the stands outward and insert the spring pin
as shown.
(1) Side frame
(2) Boom
(3) 2-Pin 5
(4) 2-M10 x 80 bolts
(5) 2-M10 locking nuts
(6) 2-Pin 4
(7) 2-Snap pins
(1) Boom cylinder
(2) Side frame
(A) Top fulcrum (Height position)
(B) Bottom fulcrum (Power position)
(1) Belt sling
(1) Stand
(2) Spring pin