ASSEMBLY INSTRUCTIONS
4
TRACTOR PREPARATION
Locate the tractor on a firm level surface. Stop the engine.
BEFORE ASSEMBLY
A
Before assembling the hardware (bolts, adapters,
hoses, etc.), ensure all contaminates (grease, grit,
dust, etc.) are removed from the threads and all mating
surfaces (Tractor, Main Frames, etc.). If oil or
contamination has adhered, clean off thoroughly
before assembling (by using contact cleaner,
scrapers, etc.). If oil or contamination remains on the
threads, it may lead to damaged threads and the
loosing of hardware and/or parts.
A
For the tightening torque, see the tables at the end of
this manual. If the torque values are specified in the
text, follow that specification.
A
Do not tighten any bolts firmly until most components
are attached to the tractor.
A
Before tightening all mounting hardware, start the
engine and apply down pressure with the bucket until
the loader takes the tractor weight off the front wheels
without lifting the front wheels off of the ground. Make
sure that the mounting pins can be rotated easily (Pin
on mount), or the Swift-Tach hooks can be unlocked
easily (Swift-Tach mount). Torque all bolts and nuts in
this position.
A
During assembly of all hydraulic parts make sure parts
remain clean of contamination. If contamination
occurs it could affect the performance of the hydraulic
system.
A
When using the tapered adapters, wrap the seal tape
around the thread part 2 or 3 times. At this time,
ensure all contaminates are removed from the
threads.
A
To avoid damage to hoses, adjust all connections to
route hoses away from sharp edges and do not twist
hoses.
A
The part number of the hose is marked on the hose
fitting, or located on the hose.
A
When fixing the pin with the bolt and nut, do not tighten
the nut completely as shown. The clearance between
the boss and the nut should be 2 to 3 mm (0.08 to 0.12
in.).
A
When applying label:
(1) Clean off all contaminates (dust, oil, grease, etc.)
from surface before applying label.
(2) Do not use the cotton work gloves or touch the
label adhesive surface with your hand.
A
Assemble on a hard surface, preferably concrete.
ASSEMBLING LOADER KIT
B
Main Frames
A
Before attaching the main frames, ensure all
contaminates (grease, grit, dust, etc.) are removed
from the threads and all mating surfaces. If oil or
contamination has adhered, clean off thoroughly
before assembling (by using contact cleaner,
scrapers, etc.). If oil or contamination remains on the
threads, it may lead to damaged threads and the
loosing of hardware and/or parts.
(1) Part number
(Marked on either position)
(1) Bolt
(2) Nut
(3) Pin
(A) 2 to 3 mm (0.08 to 0.12 in.)