8
C) Loosen the outer side of the Guide Roller Shaft nuts (M16), with the inner Guide Rollers pressed
against the Guide Ring. Adjust tightness of the Guide Rollers, using the M6 Adjusting bolts.
Make sure the Guide Rollers and Guide Ring contact against each other. After fixing M16 nuts,
tighten the M6 Adjusting bolts. (Fig.6, Pict.7)
Pict.7
Fig.6
Wheel
Guide Ring
M16 nut
e Roller
Drive Shaft Pulley
M6
bolt
Adjusting
Tip! Once the Guide Rollers are adjusted, this adjustment work is not always required as long as
all of the Guide Rollers and Guide Ring contact
shall be cut face difference due to this gap.
against each other. If there is any gap, there
D) Assemble the First Driven Shaft (V pulley) and the Hook (w/ Adjusting Long Screw) together.
Make sure that distance between the pulley and the hook is adjusted the same distance as much
as possible. Install the C-40 -Belts on the First Driven Shaft Pulley. Connect the Hook and the
Roller Chain at the tightest length. (Pict.8) Use the Crank Handle to turn the Adjusting Long
Screw. Make sure the V-Belts and the Roller Chain are slightly tense. (Pict.9)
Pict.8
Pict.9
Guide