4. Set the month.
• Press the user-setting-switch and the numeric
setting will be smaller.
• Press the display-selector-switch and the
numeric setting will be larger.
(1) One's digit of the year
(2) Month
(A) Blinking
User setting switch
Display selector switch
10
9
8
9
10
11
5. Set the day.
• Press the user-setting-switch and the numeric
setting will be smaller.
• Press the display-selector-switch and the
numeric setting will be larger.
(1) Day
(A) Blinking
User setting switch
Display selector switch
09
08
07
09
10
11
6. Change the AM/PM system to the 24-hour system.
a. Select the AM/PM system or 24-hour system by
pressing the display-selector-switch.
(1) AM/PM system
(2) 24-hour system
(A) Blinking
7. Set the hour.
• Press the user-setting-switch and the numeric
setting will be smaller.
• Press the display-selector-switch and the
numeric setting will be larger.
(1) Hour
(A) Blinking
User setting switch
Display selector switch
11
10
9
10
11
12
8. Set the minute.
• Press the user-setting-switch and the numeric
setting will be smaller.
• Press the display-selector-switch and the
numeric setting will be larger.
(1) Minute
(A) Blinking
User setting switch
Display selector switch
50
49
48
50
51
52
If you press the display-selector-switch for a long
time, the new settings will be decided.
NOTE :
• If the battery is disconnected, the clock-
setting-request-indicator
(yellow) will
blink for requesting to set the clock.
CHECKS FOR THE INDICATORS
1. Battery charge indicator
The battery-charge-indicator lights up if the charging
system fails with the engine running.
When the starter switch is turned to
[RUN]
with the
engine off, the battery-charge-indicator lights up, and
when the engine starts, the battery-charge-indicator
goes out. If the battery-charge-indicator stays on with
the engine running, stop the engine and check the fan
belt.
CHECKS BEFORE STARTING THE MACHINE
CHECKS FOR THE INDICATORS
40
R540
Summary of Contents for R540
Page 10: ...6 R540 ...
Page 20: ...SAFETY LABELS SAFE OPERATION 16 R540 ...
Page 21: ...SAFE OPERATION R540 17 ...
Page 22: ...SAFE OPERATION 18 R540 ...
Page 23: ...SAFE OPERATION R540 19 ...
Page 24: ... Canopy Cabin SAFE OPERATION 20 R540 ...
Page 25: ... Canopy Cabin Cabin SAFE OPERATION R540 21 ...
Page 26: ... Canopy Cabin SAFE OPERATION 22 R540 ...
Page 28: ...24 R540 ...
Page 146: ...wheel loader scrapping 26 wheel nut checking 102 109 working light switch 36 142 R540 ...