RT105M Operator’s Manual
Service - 161
As Needed
8. Loop cable through links nearest connector
pin.
9. Loosen plug on grease cylinder to relieve chain tension.
10. Stand clear of chain and remove lock key from connector pin. Drive connector pin out of link.
11. Unclamp links. Slowly release cable and lower chain to ground.
12. Lay chain on ground with teeth down.
Pressurized fluid or air
could pierce skin and cause severe
injury. Refer to operator’s manual for
proper use.
To help avoid injury:
•
Service digging boom grease
cylinder only while standing on
opposite side of boom.
•
Wear gloves and safety glasses,
and cover fitting with cloth when
relieving pressure in cylinder.
Crushing weight could cause death or serious
injury. Stay away.
Summary of Contents for RT105M
Page 1: ...RT105M Operator s Manual Issue 2 0 Original Instruction 053 2943...
Page 7: ...Overview 6 RT105M Operator s Manual About This Manual...
Page 25: ...Safety 24 RT105M Operator s Manual Attachment Safety Alerts...
Page 61: ...Controls 60 RT105M Operator s Manual Battery Disconnect...
Page 65: ...Operation Overview 64 RT105M Operator s Manual Leaving Jobsite...
Page 73: ...Prepare 72 RT105M Operator s Manual Check Supplies and Prepare Equipment...
Page 79: ...Drive 78 RT105M Operator s Manual Shut Down...
Page 87: ...Transport 86 RT105M Operator s Manual Retrieve...
Page 95: ...Backhoe 94 RT105M Operator s Manual Finish Job...
Page 96: ...RT105M Operator s Manual Trench 95 Trench Chapter Contents Set Up 96 Operate 98 Finish Job 100...
Page 165: ...Service 164 RT105M Operator s Manual As Needed...
Page 180: ......
Page 181: ......
Page 182: ...RT105M Operator s Manual Service Record 223 Service Record Service Performed Date Hours...
Page 183: ...Service Record 224 RT105M Operator s Manual Service Performed Date Hours...