Set Up
Dig Approach Trench
1. Mark planned bore path and all located
utility lines with flags or paint.
2. Dig an approach trench (1) along the
intended bore path.
EMERGENCY SHUTDOWN -
Turn ignition switch to STOP.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
To help avoid injury:
•
Comply with all utility notification regulations before digging or drilling.
•
Set up warning barriers and keep people away from machine and jobsite.
•
Do not operate drilling attachment if bore path is less than 10’ (3 m) from any underground hazard.
Read operator’s manual. Follow safety rules and know
how to use all controls. Your safety is at stake.
273-475
IMPORTANT:
Ensure that approach
trench is:
•
deep enough for pipe to lay flat
and enter soil at correct angle,
•
at least 20’ (6 m) long, and
•
at least 4” (100 mm) wide.
Summary of Contents for RT105M
Page 1: ...RT105M Operator s Manual Issue 2 0 Original Instruction 053 2943...
Page 7: ...Overview 6 RT105M Operator s Manual About This Manual...
Page 25: ...Safety 24 RT105M Operator s Manual Attachment Safety Alerts...
Page 61: ...Controls 60 RT105M Operator s Manual Battery Disconnect...
Page 65: ...Operation Overview 64 RT105M Operator s Manual Leaving Jobsite...
Page 73: ...Prepare 72 RT105M Operator s Manual Check Supplies and Prepare Equipment...
Page 79: ...Drive 78 RT105M Operator s Manual Shut Down...
Page 87: ...Transport 86 RT105M Operator s Manual Retrieve...
Page 95: ...Backhoe 94 RT105M Operator s Manual Finish Job...
Page 96: ...RT105M Operator s Manual Trench 95 Trench Chapter Contents Set Up 96 Operate 98 Finish Job 100...
Page 165: ...Service 164 RT105M Operator s Manual As Needed...
Page 180: ......
Page 181: ......
Page 182: ...RT105M Operator s Manual Service Record 223 Service Record Service Performed Date Hours...
Page 183: ...Service Record 224 RT105M Operator s Manual Service Performed Date Hours...