WSM U15-3
II-179
6. Route of Electric Wiring (Front)
(1) Connect the red wires and yellow wires in their respective groups and fix them to the working light frame
by cord clamps.
(2) Clamp the position marked with white tape outside the hole.
Use care so that the wire harness should not be drawn into the hole.
(3) Tighten the black wire together with the bolt.
(4) Pass it under the boom pin.
(5) Fix the clip to the metal.
(3)
(2)
(1)
(4)
(5)
Summary of Contents for u15-3
Page 1: ...WORKSHOP MANUAL KUBOTA EXCAVATOR U15 3 Code No 97899 61270...
Page 3: ...ss I Product engineering section II Service engineering section CONTENTS...
Page 4: ......
Page 6: ...WSM U15 3 I 2...
Page 20: ...WSM U15 3 I 16...
Page 65: ...WSM U15 3 II 45 b Performance curves...
Page 72: ...WSM U15 3 II 52 g Cooling system 1 Structure Hole Clamp Cap Through Cap pressure...
Page 83: ...WSM U15 3 II 63 3 Control Valve 2 Front Rear...
Page 88: ...WSM U15 3 II 68 7 Inner sectional view Tightening torque T 13 7 14 7 N m T 1 4 1 5 kgf m...
Page 130: ...WSM U15 3 II 110...
Page 132: ...WSM U15 3 II 112 n Hydraulic circuit diagram...
Page 170: ...WSM U15 3 II 150 8 Auto release and auto glow circuit combined Glow plug Glow lamp...
Page 200: ...WSM U15 3 II 180...
Page 209: ...ss Conversion Tables...
Page 210: ......
Page 211: ......