Maintenance
W9272-8135-1
185
05/2020
V-belts - check/adjust/change
Adjusting the V-belts
Open the engine compartment cover (page 154).
Check the V-belt (page 85).
Air conditioner V-belt (optional)
Loosen the lock nut (3).
Rotating the screw (4) clockwise adjusts the tension roller (2)
and tensions the V-belt (1).
Press in the V-belt at position "A". The V-belt must give way by
approx. 12-15 mm (pressure: 6-7 kg).
Tighten the lock nut (3).
After adjusting, check the V-belt.
Fan/Alternator V-belt
Loosen the fastening screw (3).
Tighten the V-belt (1) by swinging the alternator (2).
Press in the V-belt at position "A". The V-belt must give way by
approx. 7-9 mm (pressure: 6-7 kg).
Tighten the fastening screw.
After adjusting, check the V-belt.
Close the engine compartment cover.
Summary of Contents for U50-5
Page 1: ...GB COMPACT EXCAVATOR MODEL U50 5 OPERATING INSTRUCTIONS W9272 8135 1 Original 05 2020...
Page 38: ...36 W9272 8135 1 05 2020 Safety rules...
Page 54: ...52 W9272 8135 1 05 2020 Description of the machine...
Page 74: ...72 W9272 8135 1 05 2020 Assembly and functions...
Page 164: ...162 W9272 8135 1 05 2020 Operation...
Page 222: ...220 W9272 8135 1 05 2020 Maintenance...
Page 224: ...222 W9272 8135 1 05 2020 Safety inspection...
Page 234: ...232 W9272 8135 1 05 2020 Software information...
Page 235: ...Software information W9272 8135 1 233 05 2020...
Page 236: ......