Operation
W9272-8135-1
87
05/2020
Bucket bolt and linkage bolt - grease
Start the engine (page 96).
Position the arm and bucket as shown in the figure. See the
"Operating the controls during excavation work" section
(page 117).
Stop the engine (page 99).
Lubricate all greasing points (see figure to the right) – see the
"Operating materials" section (page 180) – by injecting grease
until fresh grease emerges.
Water separator - check
Visual inspection of the water separator (1) for water and sedi-
ments.
If the water separator is contaminated, empty the water separa-
tor (page 192)
Make sure that the sensor cable plug (5) is connected.
Switch the shutoff-valve to the ON position.
Wipe emerged grease off immediately and store dirty
cleaning cloths in the containers provided for disposal.
Water and impurities in the fuel settle in the water separator. The water separator is equipped with a
sensor that checks the fill level. If any such deposits form, a message will appear on the display as
shown in figure on the right.
1
1
Summary of Contents for U50-5
Page 1: ...GB COMPACT EXCAVATOR MODEL U50 5 OPERATING INSTRUCTIONS W9272 8135 1 Original 05 2020...
Page 38: ...36 W9272 8135 1 05 2020 Safety rules...
Page 54: ...52 W9272 8135 1 05 2020 Description of the machine...
Page 74: ...72 W9272 8135 1 05 2020 Assembly and functions...
Page 164: ...162 W9272 8135 1 05 2020 Operation...
Page 222: ...220 W9272 8135 1 05 2020 Maintenance...
Page 224: ...222 W9272 8135 1 05 2020 Safety inspection...
Page 234: ...232 W9272 8135 1 05 2020 Software information...
Page 235: ...Software information W9272 8135 1 233 05 2020...
Page 236: ......