Operation of spreader
Filling of spreader
Both spreading chambers are protected against moisture ingress by means of a PVC top.
Grit and spreading salt is filled into the chambers by means of an appropriate loader/device or via silos.
Observe the axle loads and the admissible total weight. Weigh the vehicle with full load and with all
attachments. Determine the weight with lifted and lowered front device.
If the spreader is overloaded, you must attach a filling mark. As grit has a higher density than spreading salt,
weighing grit is sufficient.
The grid of the spreading container must never be removed during operation. Only if the spreader is switched
off completely, the grid can be removed for a short time to repair any malfunctions.
If refined salt is filled in, the screw covers must be removed; otherwise, disturbances during
material transport are possible.
Option brine tanks:
the brine solution is filled into the tanks with a filling system via C-pipe connection. A
float switch finishes this procedure as soon as the tanks are full. Before that, the switch must be connected
to the filling system via a cable. Determine the axle loads, the admissible total weight with full brine tanks
(filled with brine solution (higher weight)) and all attachments in lifted and lowered state.
The brine tanks may also be partially filled to save weight.
The shutdown for the filling pump would be set lower in this case. Make sure that the float switch is
installed correctly. The push-button may be positioned on top, in the middle or at the bottom. The arrow on
the side of the hexagon must point upward; otherwise, the push-button does not work.
upper float switch position
middle float switch position
lower float switch position
Subject to modifications
34
_Operation of spreader
Summary of Contents for DUPLEX INOX
Page 2: ...2 ...
Page 6: ...Error diagnosis 46 Maintenance schedule for three point spreader 48 6 ...
Page 7: ...Chapter 01_7 www kugelmann com CHAPTER 01 Important notes Subject to modifications ...
Page 16: ...Subject to modifications 16_Important notes ...
Page 20: ...Subject to modifications 20_Labeling and warning notes ...
Page 21: ...Chapter 03_21 www kugelmann com Chapter 03 Technical data equipment ...
Page 26: ...26_Technical data equipment ...
Page 30: ...Subject to modifications 30_Installation and removal of spreader ...
Page 31: ...Chapter 05_31 www kugelmann com CHAPTER 05 Operation of spreader Subject to modifications ...
Page 49: ......