Putting into service
Rotary cultivators
EL22
25
Coupling the machine
- Lower the tractor three-point linkage.
- Secure each hitch pin with lynch pin.
- Attach the top link to the hitch pin.
- Secure hitch pin with lynch pin.
- Raise tractor lift linkage to free parking stand.
- Remove lynch pin (1).
- Raise and lock parking stand.
This procedure provides maximum machine
clearance in transport position.
Summary of Contents for EL22
Page 1: ...KN184AGB C OPERATOR S MANUAL Rotary cultivators EL22 KN184AGB C English 11 2009...
Page 2: ......
Page 41: ...Limited warranty Rotary cultivators EL22 39 Limited warranty...
Page 42: ...Rotary cultivators 40 EL22 Limited warranty...
Page 43: ......
Page 44: ......