Work safety
SAFETY INSTRUCTION
The following procedure must be followed exactly!
WARNING
Use of the option PURGE is limited to cleaning work. Use during run-
ning operation is precluded in order to prevent the emission of foreign
particles.
11.4.1.1
Installing PURGE option C
Procedure
1. Screw the holder for the pressure regulator and the pressure regulator
together to the plate using 2 M4x6-8.8 Allen screws (
>>>
2. Screw this assembly to the bracket with 2 M4x6-8.8 Allen screws.
3. Screw the air service unit to the bracket using 2 M4x10-8.8 Allen
screws with washers.
4. Position the bracket with assembly on the base frame and insert and
tighten 2 M6x16-8.8 hexagon bolts. Increase the tightening torque to
the specified value in several stages.
5. Connect compressed air hose to interface A1.
KR IONTEC
MA KR IONTEC V4 | Issued: 11.05.2021
www.kuka.com
| 329/344
Options
Summary of Contents for IONTEC KR 20 R3100
Page 14: ...KR IONTEC 14 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Introduction...
Page 166: ...KR IONTEC 166 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Planning...
Page 188: ...KR IONTEC 188 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Start up and recommissioning...
Page 310: ...KR IONTEC 310 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 Repair...
Page 340: ...KR IONTEC 340 344 www kuka com MA KR IONTEC V4 Issued 11 05 2021 KUKA Service...