18
GB
INSTALLATION
Drilling the Ceiling/shelf and fixing the frame
DRILLING THE CEILING/SHELF
• Use a plumb line to mark the centre of the hob on the ceiling/support shelf.
• Place the drilling template 21
21
21
21
21 provided on the ceiling/support shelf, making sure that the template
is in the correct position by lining up the axes of the template with those of the hob.
• Mark the centres of the holes in the template.
• Drill the holes at the points marked:
• For concrete ceilings, drill for plugs appropriate to the screw size.
• For hollow brick ceilings with wall thickness of 20 mm: drill ø 10 mm.
• For wooden beam ceilings, drill according to the wood screws used.
• For wooden shelf, drill ø 7 mm.
• For the power supply cable feed, drill ø 10 mm.
• For the air outlet (Ducted Version), drill according to the diameter of the external air exhaust
duct connection.
FIXING THE FRAME
Before fixing, separate the Upper Section 2.1
2.1
2.1
2.1
2.1 and
the Lower Section 2.2
2.2
2.2
2.2
2.2 from the Frame by
unscrewing the screws 12c
12c
12c
12c
12c, then separate the two
sections of the frame by unscrewing the 6 side
screws to obtain the Upper frame and Lower fra-
me.