3-1
CHAPTER 3
Maintenance of the 777
This chapter describes preventative maintenance steps for
KVAL
777 Flat Back Bi-Fold Machine.
The content is geared to guide technicians to keep a regular maintenance schedule for your KVAL
machine. Keeping your KVAL machine maintained is an important piece for successful operation
of your door production process.
Chapter 3 at a Glance
Section Name
Summary
Page
Maintenance Schedule
This section describes the assemblies to sched-
ule for maintenance.
• Daily
• Weekly
5
• Six Month Checkups
Lubrication
Requirements
This section describes the lubrication require-
ments for the machine, including types of lube to
use. This section includes:
• Linear Bearings, Flange Bearing, and Pillow
Blocks
• Gear Motor Lubrication Requirements
• Description of Air Input System
• Adjusting the Air Line Lubricator
• Priming the Air Line Lubricator
Summary of Contents for 777
Page 4: ...KVAL 777 Operation Service Manual ...
Page 23: ...Getting Help from KVAL 1 15 KVAL 777 Operation Service Manual Page Intentionally Left Blank ...
Page 48: ...Description of the Six Light Panel KVAL 777 Operation Service Manual 2 24 ...
Page 92: ...Troubleshooting with the Status Light Panel KVAL Operation Service Manual 1 20 ...
Page 95: ......