Maintenance Schedule
KVAL 777 Operation/Service Manual
3-2
Maintenance Schedule
KVAL recommends the following maintenance schedule to ensure that the machine operates
properly. Cycles refers to the quantity of processed doors. Cleaning impedes the build up of saw-
dust and grime which causes issues with the operation of the machine. Inspecting finds issues
before they become problems. Lubricating decreases wear and keeps this machine running
smoothly. Refer to sections following these tables for further description of the maintenance steps.
Note:
The steps in the tables below are designed to perform maintenance on a produc-
tion line. Some of the steps may not pertain to all machines.
Prior to performing any maintenance, repairs, cleaning or when
clearing jammed debris, you must disconnect, tagout, or lockout the
electrical and air pressure systems. This should be done in accor-
dance with applicable state and/or federal code requirements
To view a video of the maintenance process, visit the KVAL website. Select
the Video Tab to view videos.
http://www.kvalinc.com/
300 Cycles
Clean
Use pressured air to blow off dust and debris on entire machine
Clean
Blow out dust collection cans
600 Cycles
Inspect
Air Pressure Gages. Adjust, if necessary, to the proper PSI located on the label.
(Adjust only if Trained in Maintenance)
Inspect
Inspect Air Filter Water Traps. Empty if necessary
Inspect
Inspect the Tooling for wear, (Drill Bits)
Lubricate
Lubricate the inside of the Hoppers with a light coat of dry silicone spry.
Clean
Empty All Dust Collection Units
Summary of Contents for 777
Page 4: ...KVAL 777 Operation Service Manual ...
Page 23: ...Getting Help from KVAL 1 15 KVAL 777 Operation Service Manual Page Intentionally Left Blank ...
Page 48: ...Description of the Six Light Panel KVAL 777 Operation Service Manual 2 24 ...
Page 92: ...Troubleshooting with the Status Light Panel KVAL Operation Service Manual 1 20 ...
Page 95: ......