1-1
965X Operation Manual
CHAPTER 1
Introduction to the 965X System
Chapter 1 at a Glance
The following information is available in this chapter:
Section Name
Summary
Page
Overview of the 965X Jamb
System
This section provides an overview of the
machine. It includes a general description
and a table of available options
Safety First!
IMPORTANT safety information is
described in this section
page 1-6
Lockout-Tagout Guidelines
Procedures describing Lockout Tagout.
Zero-Energy to Start-Up
Procedure to power up your machine for the
first time.
Getting Help from KVAL
This section describes the method to con
-
tact the
KVAL Service Center
for help. The
section includes how to get information from
the specification plate tor provide to
KVAL
,
service center hours, and return procedures
page 1-15
Safety Sign-Off Sheet
A record to track operators that are trained
on the machine.
Summary of Contents for 965X
Page 103: ......