Maintenance Schedule
3-2
965X Service Manual
Maintenance Schedule
KVAL recommends the following maintenance schedule to ensure that the machine operates
properly. Cycles refers to the quantity of processed doors. Cleaning curtails build up of sawdust
and grime which causes issues with the operation of the machine. Inspecting, finds issues before
they become problems. Lubricating decreases wear and keeps this machine running smoothly.
Refer to sections following these tables for further description of the maintenance steps.
Note:
The steps in the tables below are designed to perform maintenance on a produc
-
tion line. Some of the steps may not pertain to all machines.
300 Cycles
Clean
Use pressured air to blow off dust and debris on entire machine
Clean
Blow out dust collection cans
600 Cycles
Inspect
Air Pressure Gages. Adjust, if necessary, to the proper PSI located on
the label.
(Adjust only if Trained in Maintenance)
Inspect
Inspect Air Filter Water Traps. Empty if necessary
Inspect
Inspect the Tooling for wear.(Drill Bits, Cutting Tools, Screw Driver
Bits)
Clean
Empty All Dust Collection Units
Prior to performing any maintenance, repairs, cleaning or when
clearing jammed debris, you must disconnect, tagout, or lockout the
electrical and air pressure systems. This should be done in accor
-
dance with applicable state and/or federal code requirements
To view a video of the maintenance pro
-
cess, visit the KVAL website. Select the
Video Tab to view videos.
http://www.kvalinc.com/