Grease Locations for the 965X
3-19
965X Service Manual
Locations of Bearings on Each Tool
For lubrication schedule information,
see “Lubrication Schedule” on page 3-12. Figure 3- 13
shows the bearings of the
Tools
from the front section viewpoint. The bearings are color coded for
easy identification.
Note:
Some bearings may be difficult to get access to. Use an extender to reach tight
areas.
1.
Park the Cutter Head,
see “How to Prepare the 965X for Greasing” on page 3-17.
2.
Perform
Lockout/Tagout
3.
Remove cover.
4.
Identify zerk fittings and apply EP-2 grease. (
See Figure 3- 13 on page 3-19)
• Jamb Stop Bearings can be accessed from the side.
5.
After lubrication is completed, re-install the cover.
6.
Reverse
Lockout/Tagout
.
FIGURE 3- 13.
Carriage Head Grease Points
Chisels
Bearings(X2)
Jamb Stop
Bearings(X2)
Predrill
Bearings(X3)
CR Router
Bearings(X3)
Jamb Stop
Bearings(X2)
Router
Bearings(X3)
Chisels
Bearings(X2)