Pre-Drill Adjustments
Pre-Drill:
These adjustments move the point-to-point drill in
the X, Y, and Z direction.
Standard and Counter Rotate
Router Adjustments
These adjustments move routers in the X,
Y, and Z direction. This also adjusts the
radius of the router cut.
Use this to compensate for minor changes
in tooling during calibration.
Chisel Adjustments
In this menu, adjustments are made to square
the chisel cuts on the hinges.
1.
Upper Left Chisel (X,Y, and Z):
Adjust-
ments here moves just the upper left chisel in
the X, Y, and Z direction.
2.
Upper Right Chisel (X, Y, and Z): A
djust-
ments here moves just the upper right chisel
in the X, Y, and Z direction.
3.
Lower Left Chisel (X, Y, and Z):
Adjust-
ments here moves just the lower left chisel in
the X, Y, and Z direction.
4.
Lower Right Chisel (X, X,Y,and Z):
Adjustments here moves just the lower right
chisel in the X, Y, and Z direction.
About the Setup Screens
2-31
KVAL 990-HB Operation / Service Manual
Summary of Contents for 990-HB
Page 4: ...KVAL 990 HB Operation Manual ...
Page 25: ...Safety Sign Off Sheet 1 17 KVAL 990 HB Operation Service Manual ...
Page 26: ...Safety Sign Off Sheet 1 18 KVAL 990 HB Operation Service Manual ...
Page 66: ...Diagnostic Screen 2 40 KVAL 990 HB Operation Service Manual ...
Page 84: ...Calibration of the Back Section 3 18 KVAL 990 HB Operation Service Manual ...
Page 88: ...System IT Administration 4 4 KVAL 990 HB Operation Service Manual ...