Replacing Tooling in the Back Section
5-27
KVAL 994-X Operation/Service Manual
Changing the Bolt Drill
Caution:
Turn off all power to the machine. Follow proper lockout/tagout procedures
as detailed in the safety section of Chapter 1 of this manual.
1.
Use the shaft wrench and collet wrench to
remove the bit on the pre-drill or router
assemblies. See photo.
When loosening the collet, it may tighten up,
crack again and continue.
2.
Inspect and clean collet assembly.
3.
Insert the new bit into the assembly.
4.
Before tightening the collet assembly, adjust
the bit depth. Bottom out the bit and pull the bit up about 1.4''.
5.
Lightly tighten and torque to correct value. For torque values,
Collet Torque Values
Note:
Make sure the arbor is not bottomed out in the back of the motor. If it is the arbor
will not tighten and will damage the collet or other machine parts.
Collet Wrench
(PN: 15-00-ER32)
Shaft Wrench 1-5/8 ''
(PN: WRENCH026)
Summary of Contents for 994-X
Page 4: ...KVAL 994 X Operation Service Manual ...
Page 31: ...Safety Sign Off Sheet 1 21 KVAL 994 X Operation Service Manual ...
Page 32: ...Safety Sign Off Sheet KVAL 994 X Operation Service Manual 1 22 ...
Page 110: ...Calibration of the Back Section KVAL 994 X Operation Service Manual 3 22 ...
Page 114: ...System IT Administration KVAL 994 X Operation Service Manual 4 4 ...
Page 144: ...Collet Torque Values KVAL 994 X Operation Service Manual 5 30 ...
Page 180: ...Symptoms and Possible Causes KVAL 994 X Operation Service Manual 6 36 ...
Page 185: ......
Page 186: ......
Page 187: ......