Initial Powering Operations for the EFX
3-7
KVAL Operation Manual
Home the Machine Line
The Machine Line must go through a homing routine before any operations are performed. The
homing routine sets a zero reference from which each machine measures its movement and cut-
ting process.
If power is lost or any machine is reset, the homing routine must be performed again. Each
machine has a
Home
button on it’s associated
Main Control Screen
or the entire machine line can
be
Homed
using the
Home Machine Line
button located on the
Machine Line Screen
.
How to Power Down the Machine
.
1.
Exit or shutdown all open programs.
2.
Shut down the operating system, by selecting
Shutdown
from the Window’s Desktop.
Note:
Make sure Windows is shutdown com-
pletely before turning off the machine.
Hard drive or data may be damaged if not
turned off in this order.
3.
For each machine, switch the green
Control
Circuit
switches to the
OFF
position.
4.
Kval also recommends that you turn the dis-
connect switches on the electrical cabinets to
OFF; this helps reduce possible damage due to
power surges from electrical storms.
Step 1
Step 2
Step 3
Step 4
Summary of Contents for EFX
Page 10: ...KVAL EFX Manual Table of Contents ...
Page 32: ...Safety Sign Off Sheet KVAL Operation Manual 1 22 ...
Page 66: ...About the LiteCutout Feature Detail DL NCD Only KVAL Operation Manual 2 34 ...
Page 95: ...Appendix About Backing up the Data 3 29 KVAL Operation Manual ...
Page 112: ...Step 4 Calibrate the Face Axes KVAL Operation Manual 4 17 X Y Z X Y Z Y ...
Page 121: ...Routers How to Isolate and Calibrate a Specific Router KVAL Operation Manual 4 26 ...
Page 136: ......
Page 138: ...Index 1 2 Kval EFX ...
Page 139: ......