2-11
Installation
54-0182 Rev. A1
2.3.2 Wiring the Antenna Unit Power Cable
TracVision S3 will not function properly unless you connect the
power cable (Cable #32-0590-30).
Power Cable-to-Baseplate Terminals Wiring Process
1. Feed the cable up to the roof and through the
fourth liquid-tight fitting (#4) from the left as
pictured previously in Figure 2-14.
2. Refer to Figure 2-19 for the proper arrangement of
power cable wires within the terminal strip.
3. After connecting the power cable to the
TracVision S3, hook up the other end to the
switchplate as described in the next subsection.
Data Cable
to Antenna
Figure 2-18
Antenna Data Cable Wiring
Arrangement
Shield
Red
Black
Brown/White
Orange/White
White/Brown
White/Orange
White/Gray
Gray/White
Shield
Grnd
+12v DC
Grnd
RTN
PC_RXD
PC_TXD
RTN
RF_TXD
RF_RXD
Grnd
1
2
3
4
5
6
7
8
9
10
Figure 2-19
Proper Terminal Strip Wiring
Arrangement – Power Cable