TYPE 9112-HEU
07/2014
11
Based on the design solution and the use to which the appliance will be put, this solid fuel
appliance must be installed into an environment which was defined as ordinary environment (for
example by standard ČSN 33 2000-3:1995 – Environment standard of the Czech Republic).
Requirements for combustion air supply will be met if the appliance is installed in a room with a
minimum volume of 20 m
3
. According to need, the appliance operation or in combination with the
contemporary operation of other heat equipment in the room, additional ventilation may be
necessary. In cases where dangerous situations may arise, such as the temporary formation of
combustible gases and works which may cause a fire to start (potentially explosive), the appliance
should be put out of service (by closing the combustion chamber door the fuel will be allowed to
burn out on the grate). If combustion, venting and heating air control louvers are used, it is
necessary to place them is such a way that clogging cannot occur.
Appliance connection to the chimney
A flue (exhaust) branch is installed to an outlet on the appliance (rear, sides, and top – through
the hob-top). The installation is carried out in such a way that a ring is applied to the internal side
of the appliance, which connects with the external flue branch, and they are mutually screwed
together moving in the opposite direction.
In case you use a side outlet, it is first necessary to unscrew the side part, from which we
dismantle the top cover of the hole, apply the blanking cap to close the rear outlet, replace the
side part and screw it closed.
With the use of the top outlet (through the hob-top) it is necessary to remove the blanking cap and
to attach the flue branch – without the ring, and use the delivered blank cover to close the rear
outlet.
A chimney with a sufficient draught is absolutely essential for correct appliance operation.
We
recommend the chimney with height of 5 meters and diameter of 160 mm.
Try to connect the
appliance using the shortest route. Flue gas ducting made of sheet-metal tubes consists of
several sections and longer than 2,000 mm shall be firmly anchored. The entire set shall be
mutually, firmly and tightly connected in the draught direction (individual overlaps must be a
minimum of 80 mm). An existing chimney flue shall be provided with an approved liner flue that
corresponds to the exhaust flue diameter.
Connection of the appliance to the chimney should comply with the individual national regulations
at place of installation and use (for example ČSN 73 4201:2008 Standard of the Czech Republic).
The chimney shall be issued with a certificate (revision report) given by a respective authority
(chimney sweeping agency). The appliance should be installed in such a way that adequate
access can be provided for cleaning of the flue ducting and the chimney. In assembly, it is
necessary to observe the principles of fire safety (for example according to the ČSN 06 1008:1998
Standard of the Czech Republic).
The cooker can’t be connected to a shared chimney (Drawing 4).
Chimneys and flue ducting to which solid fuel are connected shall be swept 2 times or 3 times a
year – seasonal or yearlong operation (for example according to the Czech governments Decree
No. 91/2010 Coll.). Routine operation, especially due to damp fuel, soot and tar creates deposits
in the chimney. If regular inspection and chimney cleaning are omitted, the probability of a fire in
the chimney increases.
INSTALLATION MANUAL