EN
PL
14
RU
DE
OPERATING INSTRUCTIONS
DEVICE ASSEMBLY
Do not remove the head (fig. 1/pos. 4) from the tank (fig. 1/pos. 8).
Make sure that the ball valve is in the close position (fig. 2b/pos. 1). If not, turn the ball valve lever by 90
degrees (fig. 2a/pos. 1). Next, the handle with ball valve (fig. 2b/pos. 1) connect with lance (fig. 2b/pos. 2).
Fig.3
Attach the shoulder strap - adjust length as needed.
Fig.2a
Fig.2b
2
2
1
1
PREPARATION FOR WORK
Before work, test the functioning of the safety valve.
The following actions should be performed with the tank filled with water to its rated capacity - see technical
data table.
Always depressurise the tank before unscrewing the pump!!!
The valve open
The valve closed