22
4.
FACE BELL ROLLER AND BACK BELL ROLLER:
•
Adjusting bell rollers will control the squaring of the bottom corners of the gutter as well as into and away
from the house.
ADJUSTMENT
1.
Loosen PIVOT BOLT, LOCKING BOLT, and the LOCKNUT on ADJUSTMENT BOLT.
2.
TO MOVE BELL ROLLER CLOSER TO THE TOP DRIVE ASSEMBLY
:
Turn ADJUSTMENT BOLT counter-clockwise (this will allow bell wheel to move towards top roller).
3.
TO MOVE BELL ROLLER AWAY FROM THE TOP DRIVE ASSEMBLY
:
Turn ADJUSTMENT BOLT clockwise to the desired clearance.
4.
Tighten PIVOT BOLT, LOCKING BOLT, and LOCKNUT on ADJUSTMENT BOLT.
5.
COMBO MACHINE – BACK BELL WHEEL:
a.
FOR 5” OPERATION
, the back bell wheel needs to be moved towards the center of the machine.
b.
FOR 6” OPERATION
, move the back bell wheel away from the center.
COMBO ADJUSTMENT
:
5” Gutter Position:
1.
Remove BOLT (W) and Bell Wheel
2.
Install BACK TOP #3 DRIVE ROLLER in 5” Position (SEE PG. 20)
3.
Install Bell Wheel and BOLT (W) in the 5” Position.
6” Gutter Position:
1.
Remove BOLT (W) and Bell Wheel
2.
Install BACK TOP #3 DRIVE ROLLER in 5” Position (SEE PG. 20)
3.
Install Bell Wheel and BOLT (W) in the 6” Position.
6.
COMBO MACHINE – BACK TOP #3 EXIT DRIVE ROLLER:
a.
FOR 5” OPERATION
, the back top #3 drive roller will be installed in the recessed position.
b.
FOR 6” OPERATION
, the back top #3 drive roller will be installed in the flush position.
ADJUSTMENT
:
1.
Remove SET SCREW B (2 places) on the backside top #3 drive roller. (SEE PG. 20)
2.
Remove roller, rotate 180 degrees, and reinstall.
3.
Replace setscrews and tighten.