34
STEP 11: MOVE ENTRY GUIDE SHOES.
(SEE PG. 36)
•
There are two split collars used as stops on the entrance guide shaft to locate each entrance guide shoe for the
5” and 6” gutter position.
•
To position the entrance guide shoes from the 5” to the 6” position, loosen cap screws and slide the entrance
guide shoes against the outer most collars on the shaft.
STEP 12: MOVE THE THREE FACE BOX ASSEMBLY STATIONS.
(SEE PG. 37)
•
Pull the retractable pin that is located at the top of each station assembly.
•
Raise the face roller assembly up to the 6” gutter position and release pin.
•
Repeat this step for each of the face box assemblies.
STEP 13: MOVE LIP BOX ASSEMBLY.
(SEE PG. 37)
•
Loosen the two MOUNTING BOLTS on the ENTRANCE MOUNT ASSEMBLY. (BLACK)
•
Loosen the two MOUNTING BOLTS on the EXIT MOUNTING ASSEMBLY. (GREEN)
•
Move the lip box up and out on the box frame mounts.
•
Tighten mounting bolts.
STEP 14: REMOVE THE 5” INSIDE BOX ROLLER BAR ASSEMBLY.
(SEE PG. 35)
•
To remove the 5” inside box roller bar assembly, remove the two RED station F-screws on the top of the box.
•
Place this assembly to the side.
STEP 15: MOVE THE SIX OUTSIDE BOX BOTTOM ROLLERS.
(SEE PG. 37)
•
Pull the retractable pin and lower the bottom portion of the outside roller down to the 6” position.
•
Release the retractable pin.
•
Repeat this step for each of the lip box stations.
STEP 16: INSTALL THE 6” INSIDE BOX ROLLER BAR ASSEMBLY.
(SEE PG. 37)
•
Remove the 6” inside box roller bar assembly from the storage location; this assembly is labeled as (6).
•
Install the 6” inside box roller bar assembly in the lip box, replace the two RED station F-SCREWS and tighten.
•
The tall rollers located in the #1 station and the #2 station.
The short rollers located in the #3 station and the #4 station.
STEP 17: STORE 5” INSIDE BOX ROLLER BAR ASSEMBLY.
(SEE PG. 35)
•
Install the 5” inside box roller bar assembly from the storage location
STEP 18: REPLACE #1-4 COVERS.
(SEE PG. 34)
•
Turn the cover screws ¼ turn clockwise to fasten.
STEP 19: MOVE UPRIGHT BASE-PLATE.
(SEE PG. 10)
•
Remove Coil Spool from Upright Assembly
•
Rotate the upright to access the two bolts on the face side.
•
Loosen the four L-SCREWS as shown.
•
Slide the upright base-plate to the 6” position.
•
Tighten the screws.
STEP 20: REPLACE THE 5” SPOOL ASSEMBLY WITH 6” SPOOL ASSEMBLY.
(SEE PG. 10)
•
Remove the 5” spool assembly
•
Load the 6” gutter material on Spool Assembly. (SEE SECTION 8, PG. 9)
•
Place loaded spool onto upright assembly using an approved lifting device.
•
NOTE:
Pins must be reinstalled in holes stamped for the 6” position.
CAUTION:
Spool must line up with the entrance guides.