Moving the guides to acquire 1 3/8" of metal as illustrated on pg.13 (EXAMPLE
PROBLEM TO MUCH LIP. (1) REMOVE CENTER COVER AND FRONT LID. (2) WITH
GUTTER RUN THROUGH GUILLOTINE 12" BACK GUTTER UP 6" CHECK FOR
DOUBLE TRACK AT ENTRANCE OF BOX WHERE 1 3/8" BENT MEETS WITH
BOTTOM OF INSIDE BOX ROLLERS. (3) MEASURE AMOUNT OF COIL IN BOX 1 5/
8" INCORRECT AMOUNT OF METAL. (4) MEASURE RIGHT GUIDE SHOE NOTE
MEASUREMENT, MOVE RIGHT GUIDE SHOE FROM WALL TO THE LEFT 1/8" KEEP
GUIDE PARALLEL TO WALL. (5) MOVE LEFT GUIDE TO THE LEFT ALLOWING
ENOUGH ROOM FOR COIL. (6) INSERT A 2' LONG PIECE OF COIL STOCK INTO
THE GUIDE SYSTEM UP TO THE RIGHT GUIDE.
(7) MOVE THE LEFT GUIDE TO RIGHT UNTIL IT LIGHTLY TOUCHES THE LEFT
EDGE OF THE COIL. (8) TIGHTEN ALL BOLTS. (9) FEED THE MACHINE AND
CHECK FOR 1 3/8" OF METAL.
– 33 –
Summary of Contents for PANTHER
Page 8: ... 6 ...
Page 9: ... 7 ...
Page 10: ... 8 ...
Page 12: ... 10 ...
Page 15: ... 13 ...
Page 17: ... 15 ...
Page 20: ... 18 ...
Page 23: ... 21 ...
Page 25: ... 23 ...
Page 28: ... 26 ...
Page 29: ... 27 ...
Page 31: ... 29 ...