4.8.3 Cross link bridge
20
Cut 20cm
Keep the width 60cm
4.8 Technical solution of connecting bridge
4.
Use guide
Due to safety reasons, the cross-bank process is technically limited.
If it is exceeded, an alarm will be sounded and autonomous operation will be interrupted.
Therefore, the length of the cross-line connection bridge is only allowed to be less than or equal to 35cm.
That is, you can use this method only when the distance between the front and rear ends of the PV array is less
than or equal to 35cm.
A clean bridge deck without guide wires is laid horizontally along the Kwun’s operation track on adjacent array aisles at the front and rear ends.
In this way, the bridge deck simulates replacing gaps between photovoltaic modules while meeting the height requirements of the plane,
Kwun will guide driving along the bridge deck without a straight line for a short time to pass through the bridge deck until stepping into the new array, and start
the covering cleaning operation of the new array.
Interval 20 cm
Cut 20cm
Keep the width 64cm
The interval should not exceed 35cm
* For more information about kwun-B30 connection bridge construction, please visit the official website