10
. A.C. GENERATOR/STARTER CLUTCH
10-4
DOWNTOWN 125i
INSPECTION
Check the stator and pulse coil for damage.
INSTALLATION
Install the stator and tighten the stator mount
bolts to the specified torque.
Torque:
1 kgf-m
Apply sealant to the grommet seating surface
and install it to the cover groove properly.
Install the pulse coil and tighten mount
screws securely.
Clean the mating surfaces of the right
crankcase and cover.
Pulser Coil
Stator
Dowel Pins
Gasket
Cortesia de/ Courtesy of: www.batmotos.com
Cortesia de/ Courtesy of: www.batmotos.com