5. ENGINE REMOVAL/INSTALLATION
5-7
DOWNTOWN 125i
INSTALLATION
Installation is in the reverse order of removal.
Tighten the engine mounting bolt/nut to the
specified torque.
Torque
: 5 kgf-m (50 N-m)
Tighten the right and left rear shock absorber
lower mount bolts to the specified torque.
Torque
: 4.0kgf-m (40N-m)
Install the rear brake caliper and tighten the
mount bolts to the specified torque.
Torque
: 3.2 kgf-m (32 N-m, 23 lbf-ft)
After installation, inspect and adjust the
following:
•
Throttle grip free play
•
Fill the cooling system with coolant and
start the engine to bleed air from the system.
API/ABV Reset(Refer to chapter14 page 17)
Cortesia de/ Courtesy of: www.batmotos.com
Cortesia de/ Courtesy of: www.batmotos.com