16
. BATTERY/CHARGING SYSTEM
16-4
PEOPLE 250
BATTERY
Remove the seat and met-in box. (
!
2-3)
Remove the battery cover screw and the
battery cover.
Remove the battery.
First disconnect the battery negative (-) cable
and then the positive (+) cable.
The installation sequence is the reverse of
removal.
BATTERY VOLTAGE INSPECTION (OPEN
CIRCUIT VOLTAGE)
Disconnect the battery cables.
Measure the voltage between the battery
terminals.
Fully charged : 13.2V
Undercharged : 12.3V max.
CHARGING
Connect the charger positive (+) cable to the
battery positive (+) terminal.
Connect the charger negative (-) cable to the
battery negative (-) terminal.
Charging current : Standard : 1.2A
Quick
: 5A
Charging time
: Standard : 5
_
10 hours
Quick
: 60 minutes
After charging: Open circuit voltage: 12.8V min.
Battery Cover
When disconnecting the battery positive
(+) cable, do not touch the frame with
tool; otherwise it will cause short circuit
and sparks to fire the fuel.
*
•
Keep flames and sparks away
from a charging battery.
•
Turn power ON/OFF at the
charger, not at the battery terminals to
prevent sparks near the battery.
•
Charge the battery according
to
the current specified on the battery.
•
During quick charging, the
battery temperature should not exceed
45
℃
.
*
•
Quick charging should only be done in
an emergency.
•
Measure the voltage 60 minutes after
the battery is charged.
*
Battery charging inspection must be
performed with a voltmeter.
*
First connect the positive (+) cable and then
negative (-) cable to avoid short circuit.
*
Screw
Summary of Contents for People S 250
Page 21: ...1 GENERAL INFORMATION 1 18 PEOPLE 250 WIRING DIAGRAM ...
Page 34: ...2 EXHAUST MUFFLER FRAME COVERS 2 1 PEOPLE 250 SCHEMATIC DRAWING ...
Page 71: ...6 CYLINDER HEAD VALVES 6 1 PEOPLE 250 SCHEMATIC DRAWING ...
Page 83: ...7 CYLINDER PISTON 7 1 PEOPLE 250 SCHEMATIC DRAWING ...
Page 92: ...8 DRIVE AND DRIVEN PULLEYS V BELT 8 1 PEOPLE 250 SCHEMATIC DRAWING ...
Page 106: ...8 DRIVE AND DRIVEN PULLEYS V BELT 8 15 PEOPLE 250 Install the left crankcase cover 8 3 ...
Page 108: ...9 FINAL REDUCTION 9 1 PEOPLE 250 SCHEMATIC DRAWING ...
Page 117: ...10 A C GENERATOR STARTER CLUTCH 10 1 PEOPLE 250 SCHEMATIC DRAWING ...
Page 127: ...11 CRANKCASE CRANKSHAFT 11 1 PEOPLE 250 SCHEMATIC DRAWING ...
Page 134: ...12 COOLING SYSTEM 12 1 PEOPLE 250 SCHEMATIC DRAWING ...
Page 151: ...13 FUEL SYSTEM CARBURETOR FUEL PUMP FUEL TANK 13 1 PEOPLE 250 FUEL SYSTEM ...
Page 152: ...13 FUEL SYSTEM CARBURETOR FUEL PUMP FUEL TANK 13 2 PEOPLE 250 SCHEMATIC DRAWING ...
Page 191: ...15 REAR BRAKE REAR FORK REAR WHEEL REAR SHOCK ABSORBER 15 1 PEOPLE 250 SCHEMATIC DRAWING ...