2M2/2M3
1-5-11
(2) Detaching and refitting the operation panel PWB
Procedure
1. Remove the control unit (see page 1-5-
7).
2. Unhook the two hooks and then remove
the operation panel unit.
Figure 1-5-17
3. Unhook the two hooks and then remove
the operation panel PWB.
4. Check or replace the operation panel
PWB and refit all the removed parts.
Figure 1-5-18
Hook
Hook
Operation panel unit
Operation panel unit
Operation panel PWB
Hooks
Summary of Contents for FS-1040
Page 1: ...SERVICE MANUAL Published in March 2012 842M3110 2M3SM060 First Edition FS 1040 FS 1060DN ...
Page 3: ...Revision history Revision Date Replaced pages Remarks ...
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 14: ...2M2 2M3 This page is intentionally left blank ...
Page 66: ...2M2 2M3 1 4 20 This page is intentionally left blank ...
Page 100: ...2M2 2M3 2 1 14 This page is intentionally left blank ...
Page 130: ......
Page 131: ...2012 ...