![background image](http://html1.mh-extra.com/html/kyocera/taskalfa-620/taskalfa-620_service-manual_2015981273.webp)
2KN/2KP
1-5-53
(3) Detaching and refitting the transfer roller
Follow the procedure below to replace the transfer roller.
Procedure
1. Remove the transfer unit (see page 1-5-49).
2. Remove the transfer belt (see page 1-5-51).
3. Remove the screw of the transfer unit rear
and then remove the terminal, spring and
pin.
* When refitting the spring, make sure that the
wider edge is facing toward the terminal.
Figure 1-5-110
4. Push up the front and rear transfer roller
bearing using the flat-blade screwdriver, and
then remove the roller from the transfer unit.
5. Remove the bearings from the both ends of
the transfer roller.
6. Replace the transfer roller and attach the
roller to the transfer unit.
Figure 1-5-111
7. Refit the transfer belt to the transfer unit.
8. Refit the transfer unit.
Terminal
Spring
Pin
Transfer roller
Bearing
Transfer unit
Bearing
Summary of Contents for TASKalfa 620
Page 1: ...SERVICE MANUAL Published in August 2009 842KP112 2KPSM062 Rev 2 TASKalfa 620 820 ...
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 144: ...2KN 2KP 1 3 106 This page is intentionally left blank ...
Page 308: ...2KN 2KP 1 5 88 This page is intentionally left blank ...
Page 412: ...2KN 2KP 2 3 60 This page is intentionally left blank ...
Page 435: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR SIDE FEEDER ...
Page 442: ...INSTALLATION GUIDE FOR LARGE SIZE SIDE FEEDER ...
Page 460: ...INSTALLATION GUIDE FOR DOCUMENT FINISHER ...
Page 475: ...INSTALLATION GUIDE FOR CENTERFOLD UNIT ...
Page 490: ...INSTALLATION GUIDE FOR MULTI JOB TRAY ...
Page 501: ...INSTALLATION GUIDE FOR PUNCH UNIT ...
Page 512: ...INSTALLATION GUIDE FOR STOPPER GUIDE ...
Page 515: ...INSTALLATION GUIDE FOR PRINTING SYSTEM ...
Page 518: ...INSTALLATION GUIDE FOR SCAN SYSTEM ...
Page 520: ......
Page 521: ......