![background image](http://html1.mh-extra.com/html/kyocera/taskalfa-620/taskalfa-620_service-manual_2015981386.webp)
2KN/2KP
2-3-34
YC2
20
GND
-
-
Signal ground
Connected
to the SHD
PWB
21
GND
-
-
Signal ground
22
GND
-
-
Signal ground
23
12V
O
12 V DC
12 V DC power output
24
12V
O
12 V DC
12 V DC power output
25
12V
O
12 V DC
12 V DC power output
26
12V
O
12 V DC
12 V DC power output
YC3
1
1A-1
I
0/5 V DC (pulse)
CCD clock 1A signal
Connected
to the SHD
PWB
2
2A-1
I
0/5 V DC (pulse)
CCD clock 2A signal
3
1A-2
I
0/5 V DC (pulse)
CCD clock 1A signal
4
2A-2
I
0/5 V DC (pulse)
CCD clock 2A signal
5
GND
-
-
Signal ground
6
GND
-
-
Signal ground
7
GND
-
-
Signal ground
8
GND
-
-
Signal ground
9
2B0
I
0/5 V DC (pulse)
CCD clock 2B signal
10
SH0
I
0/5 V DC (pulse)
CCD clock SH signal
11
GND
-
-
Signal ground
12
RS0
I
0/5 V DC (pulse)
CCD clock RS signal
13
CP0
I
0/5 V DC (pulse)
CCD clock CP signal
14
GND
-
-
Signal ground
15
ISSCLKAFE
I
0/5 V DC (pulse)
CCD clock signal
16
ISSDIAFE
I
0/5 V DC (pulse)
CCD serial communication signal
17
ISSDOAFE
O
0/5 V DC (pulse)
CCD serial communication signal
18
ISSELAFE
I
0/5 V DC
CCD SEL signal
19
GND
-
-
Signal ground
20
GND
-
-
Signal ground
21
GND
-
-
Signal ground
22
GND
-
-
Signal ground
23
CLK5V
O
5 V DC
5 V DC power output
24
CLK5V
O
5 V DC
5 V DC power output
25
CLK5V
O
5 V DC
5 V DC power output
26
CLK5V
O
5 V DC
5 V DC power output
Connector
Pin No.
Signal
I/O
Voltage
Description
Summary of Contents for TASKalfa 620
Page 1: ...SERVICE MANUAL Published in August 2009 842KP112 2KPSM062 Rev 2 TASKalfa 620 820 ...
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 144: ...2KN 2KP 1 3 106 This page is intentionally left blank ...
Page 308: ...2KN 2KP 1 5 88 This page is intentionally left blank ...
Page 412: ...2KN 2KP 2 3 60 This page is intentionally left blank ...
Page 435: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR SIDE FEEDER ...
Page 442: ...INSTALLATION GUIDE FOR LARGE SIZE SIDE FEEDER ...
Page 460: ...INSTALLATION GUIDE FOR DOCUMENT FINISHER ...
Page 475: ...INSTALLATION GUIDE FOR CENTERFOLD UNIT ...
Page 490: ...INSTALLATION GUIDE FOR MULTI JOB TRAY ...
Page 501: ...INSTALLATION GUIDE FOR PUNCH UNIT ...
Page 512: ...INSTALLATION GUIDE FOR STOPPER GUIDE ...
Page 515: ...INSTALLATION GUIDE FOR PRINTING SYSTEM ...
Page 518: ...INSTALLATION GUIDE FOR SCAN SYSTEM ...
Page 520: ......
Page 521: ......