4’
6’
8’
12’
Facing Area
16.8 ft
2
25.1
ft
2
33.5
ft
2
50.2
ft
2
Cubic Capacity
47.8 ft
3
71.6
ft
3
95.5
ft
3
143.2
ft
3
Evap Temp
Discharge Air
Velocity
(1 hr. after Defrost)
Discharge Air
Temp
30°F 250
FPM 34°F
Evaporator Temp = 27°F when lighted.
Discharge Air Temp = 32°F when lighted.
HQD6L
CASE DATA AMPS
4’
6’
8’
12’
PSC Fan / # Fans
0.37/1 0.52/
2 0.74/2
1.11/3
ECM Fan / # Fans
0.30/1 0.60/2 0.60/2
0.90/3
T8 Lights
(per shells)
0.25 0.22 0.25 0.25
LED Lights
(per shelf)
0.11 0.09 0.11 0.11
T8 Lights
(Canopy, 1 row)
0.25 0.40 0.50 0.75
LED Lights
(Canopy, 1 row)
0.24 0.36 0.48 0.72
T8 Lights
(Noselight)
0.25 0.40 0.50 0.75
LED Lights
(Noselight)
0.11 0.18 0.22 0.33
All electrical data based on 115V and unlighted shelves.
DEFROST CONTROLS
Defrost
Per Day
Fail Safe
Termination
Off Cycle
3
40 min
48°F
Hot gas
3
20 min
48°F
BTUH per FT of Case
PSC Fan
1350
14
Summary of Contents for 6RLG3
Page 3: ...2 6 2006 2 Addendum Ballast Relocation 2 ...
Page 5: ...2 6 2006 4 Addendum Ballast Relocation Wiring Diagram Both Canopy and Raceway 4 ...
Page 6: ...2 6 2006 5 Addendum Ballast Relocation Wiring Diagram for Canopy Light 5 ...
Page 9: ...Plan Views and Cross Sections D6L D6 D6H 8 ...
Page 10: ...D6RL D6R 9 ...
Page 11: ...QD6 10 ...
Page 34: ...D6 Electrical Model Table QD6 1 3 04 Through D6H 1 3 6 UNIT INSTALLATION 33 ...
Page 35: ...D6 Electrical Model Table D6H 1 3 6 Through D6R 1 3 4 UNIT INSTALLATION 34 ...
Page 36: ...D6 Electrical Model Table D6R 1 3 4 Through D6RL G 1 6 UNIT INSTALLATION 35 ...
Page 39: ...Wiring Diagram UNIT INSTALLATION 38 ...
Page 40: ...Wiring Diagram Canopy One 1 and Two 2 Light Rows UNIT INSTALLATION 39 ...
Page 41: ...Wiring Diagram Canopy Two 2 and Three 3 Light Rows UNIT INSTALLATION 40 ...
Page 42: ...Wiring Diagram Canopy Two 2 Light Rows and Nose Light UNIT INSTALLATION 41 ...
Page 43: ...Wiring Diagram Off Cycle Defrost UNIT INSTALLATION 42 ...