5
■
Choosing of the installation place
y
For the place to install the boiler, choose the place possible to do the accompanying works, such as water
supply works or electric works.
y
For the place to install, choose the place conformed to the installation standards of the boiler and the
construction act of the code of each city or municipality
y
Install the boiler in the place as wide as possible for the maintenance and the fire prevention.
y
Install the boiler in the place convenient for controlling and manipulation of the temperature.
y
If there is no electric outlet in the proper position, do wiring by requesting to a company designated by the
electric power company.
y
Around the installation place, there must be no place which stores and treats the combustibles and the
inflammables.
y
There should be equipped drainage in the in stalling spot.
■
The diagram of the standard piping : Expansion tank install type
(Model No. : 200NHC, 250NHC, 350NHC)
2. How to install
Summary of Contents for KDB-200NHC
Page 21: ...21 MODEL NO KDB 200NHC 250NHC 350NHC 10 Electric wiring diagram ...
Page 22: ...22 ...
Page 23: ...23 MEMO ...
Page 24: ...24 MEMO ...