k c a - 영 문
42
All pipes should be inspected for leaks after assembly is
completed to prevent any defects or leaks.
All pipes other than the gas pipes should be insulated for
prevention against freezing after assembly is completed.
When connecting the pipes, after fixing the connections using
the spanner, etc., connect it to the pipes.
Distributor Specifications
- Less than 5 holes
: Inner diameter of over 36mm
- Over 6 holes
: Inner diameter of over 44mm
Distributor material
- Please use non-Corrosive material
- Do not use aluminum, carbon steel pipes, cast iron materials
since they are easily corroded.
Gas Meter Specifications
- 20,000 kcal/h or less
: Over 3 level
- 25,000~35,000 kcal/h
: Over 5 level
Standard Piping Diagram