Rigging procedures
Adding a pullback with A10-BUMP/A10-RIGBAR
Type of deployment
own array with pullback
A10-BUMP/A10-RIGBAR
Rigging accessory
1 x Ø12 mm shackle WLL 1 t (provided)
Min number of operators
2
Risk of falling objects
Verify that no unattached items remain on the product or assembly.
Assembly
Procedure
1.
Prepare a vertical array as described in
(p.70).
2.
Raise the array until the bottom enclosure is accessible.
3.
Secure A10-BUMP or A10-RIGBAR under the array.
A10-BUMP
A10-RIGBAR
Connect A10-BUMP to the bottom enclosure on both
sides.
Connect A10-RIGBAR to the bottom enclosure on both
sides.
SHLAK!
SHLAK!
A10 owner's manual (EN) version 1.1
77