Rigging procedures
Optionally, secure an M-BAR on A15-BUMP to extend the site angle capability.
Use the provided 3/8" ball-locking pins.
2.
Secure A15-BUMP or A15-RIGBAR on top of the array.
A15-BUMP
A15-RIGBAR
Connect A15-BUMP to the top enclosure on both sides.
CLICK!
Connect A15-RIGBAR to the top enclosure on both sides.
CLICK!
Final check
Visually check that no yellow labels are visible.
Manually check that all linking points are secured.
3.
Select the pick-up point and raise the array.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
F
R
FRONT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
50
A15 owner's manual (EN) version 1.2