Rigging procedures
N - Using a K2-RIGBAR to implement a pullback
Space between linking points
The space between the two linking points used for this conguration must be aligned with the array pickup points.
The deployment load-bearing lines must be parallel to each other.
under K2-RIGBAR
under K2-BAR
Procedure
1.
Hang the LA-SLING2T to the hook.
Make sure the chains are not twisted.
2.
Attach the bar to the sling using the two 3.25 t WLL shackles.
Use the interior holes of the bar.
The external holes are dedicated to additional safety.