Rigging procedures
c) Tighten all the screws on the supporting enclosure.
Apply a torque of 5 N.m.
5 N.m
5.
(p.53) until the array is completed.
6.
Tighten all the screws on the last enclosure.
Apply a torque of 5 N.m.
7.
Check that all the screws are secured and tightened and raise the array.
What to do next
•
Adding a pullback with KARAIIi-RIGBAR
(p.65)
•
(p.94)
54
Kara IIi owner's manual (EN) version 2.0