Rigging procedures
13.
Tighten all the screws on the last enclosure.
Apply a torque of 5 N.m.
5 N.m
14.
Check that all screws are secured and tightened.
What to do next
• Exchange the Kara IIi grills so that the logo is positioned on the right-hand side:
(p.92),
• or secure a screen:
(p.94)
Kara IIi owner's manual (EN) version 2.0
91