Rigging procedures
This step requires three operators.
Hold the enclosure at the bottom until the rigging plates are secured.
4.
Secure the second Kara IIi under the array.
a) Lift Kara IIi and link the enclosures at the front with rigging screws.
Do not fully tighten the screws.
b) Link the enclosures at the rear with the rigging screws.
Select the holes and inserts depending on the inter-element angle.
0°
+1°
+2°
+4°
+3°
+5°
+7.5°
+10°
A
B
Kara IIi owner's manual (EN) version 2.0
53