Inspection and preventive maintenance
Mixed Kiva II array with SB15m and KIBU-SB
Refer to
Rigging part inspection
(p.37).
Rigging rails, storage pins
(p.41)
Shackles
(p.43)
Rigging rails, storage pins
(p.41)
Coupling bars, locking tabs
(p.38)
Coupling bars, locking tabs
(p.38)
Ball-locking pins
(p.39)
Rigging check
(p.45)
CLICK !
Back cover inspection
(p.44)
Rigging axis, lodging
(p.42)
logo on the same side as the safety
mechanism
32
Kiva II owner's manual (EN) version 1.0