Rigging procedures
Risk of trapping hand/ngers
Do not rest the array completely on the stack
Make adjustments to align the rigging points.
6.
Lower the array and connect it to the stack.
CLICK !
Set the inter-enclosure angle at 0°.
SHLAK !
0°
Final check
The yellow label is not visible on the logo side.
Shake the assembly up and down and from side to side to verify that all linking points are secured.
Do not stand behind the array.
The array swings backward when it is raised.
7.
Raise the assembly.
56
Kiva II owner's manual (EN) version 1.0