Rigging procedures
3.
Select the pick-up point and raise the array.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
F
R
FRONT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
4.
Secure an additional KS21i under the array:
a)
This step requires three operators.
Hold the enclosure at the bottom until the rigging plates are secured.
Lift the rear of the new KS21i and secure it to the array by pre-tightening a rigging screw on both sides.
b) Remove the rigging screws at the bottom front on both sides of the supporting KS21i.
58
A15i owner's manual (EN) version 1.0
Summary of Contents for KS21i
Page 1: ...A15i owner s manual EN ...