Rigging procedures
Flying KS28
type of deployment
own array
rigging accessories
KS28-BUMP
LA-SLING2T (optional)
KS28-CHARIOT (optional)
additional material
2 Ø19 mm shackles WLL 3.25 t
min number of operators
2
Secondary safety on KS28-BUMP
Use the holes next to the pick-up points to implement a secondary safety. Refer to
KS28-BUMP
(p.12).
Consider using LA-SLING2T.
Risk of falling objects
Verify that no unattached items remain on the array.
Assembly
Procedure
1.
Secure two chains to the selected pick-up points on KS28-BUMP.
2.
Lift the assembly.
3.
Position a stack of KS28 under the pickup point.
See
Stacking KS28 vertically
(p.17).
KS28 rigging manual (EN) version 2.0
20