KUDO_RM_ML_1.0
w w w . l - a c o u s t i c s . c o m
15 en
EN
4.
Secure KUDO
®
#2 to KUDO
®
#1
by attaching both BLP to both front rigging points.
Figure 16: Securing KUDO
®
#2 to KUDO
®
#1
5.
Repeat steps 2 through 4 for all KUDO
®
enclosures.
6.
Arrange / stack the dolly boards.
6.1.3
Taking down the array
1.
Remove both
lower front
BLP from the next to bottom KUDO
®
enclosure.
Figure 17: Detaching the next to bottom enclosure’s front rigging points