Operation
Operation
Powering on
Press the POWER key (2) for one second.
The amplied controller goes through a 9 seconds start-up sequence displaying
Initializing Controller
. The POWER
LED turns off, then is lit in orange (1).
Initializing
Controller
1
2
The amplied controller is ready for use when the main screen is displayed and the power LED is lit in green. Refer to
(p.33).
Powering off
Press the POWER key for one second.
The LCD screen and LEDs turn off. The POWER LED is lit in red to indicate that the controller is not disconnected from
mains.
The amplied controller is no longer detected over the network, but it still transmits Ethernet data in daisy-chains.
Powering off the amplied controller does not disconnect it from mains.
Power loss
If power is lost, the amplied controller shuts down, but all parameters are restored when the amplied controller
switches on again.
LA12X user manual (en) version 2.0
30
Summary of Contents for LA12X
Page 1: ...LA12X user manual en...
Page 5: ...Latency 70 Remote control and monitoring 70 Physical data 70 Approvals 71 5...
Page 16: ...Installation Refer to the LA RAK II user manual LA12X user manual en version 2 0 16...
Page 71: ...Approvals Approvals 71 LA12X user manual en version 2 0...
Page 72: ......